Construction and Commissioning of Transformer Substations TS2 and TS3 – Belgrade Waterfront

As part of the project at the prestigious Belgrade Waterfront – Plot 24 location, we successfully completed the construction and commissioning of two transformer substations: TS2 and TS3, each with a capacity of 2×630 kVA, voltage ratio 10/0.42 kV.

Transformer installation at TS3 – Elektrovat - BWT- Belgrade water front

Project Overview:

 

Both substations are located on the underground level of a shared parking structure of two residential buildings, directly across from the Galerija Shopping Center.

 

Scope of work included:

 

  • Delivery and installation of equipment for TS2 and TS3

  • Installation of two 630 kVA transformers per station

  • Installation of two low-voltage (LV) and one medium-voltage (MV) switchgear per station

  • Mounting of metering cabinets and complete electrical connections

  • Connecting transformers to LV switchgears using copper busbars

  • Cable routing and terminations between LV and MV switchgears

  • Full testing and functional commissioning

  • Following the successful internal technical inspection, the substations were put into trial operation and handed over to the Belgrade Electric Distribution (EDB).

All equipment used in the project was provided by the renowned manufacturer Schneider Electric, for whom we, Elektrovat, are official partners.

Location and Importance:

This project forms a key part of the dynamic development within the prestigious Belgrade Waterfront residential and commercial complex. Execution required a high standard of quality and precise coordination of all on-site activities.

  • Belgrade Waterfront transformer substation construction - Elektrovat

HOW CAN WE HELP ?

Do you need assistance with some project of yours, or you simply want to explore your options… don’t hesitate!

WORKING HOURS

8:00am – 4:00pm

WORKING HOURS

8:00am – 4:00pm