Solar Power Plant “Tabanović”

The solar power plant “Tabanović” is designed as a modern photovoltaic power plant with a capacity of 3 MW AC, installed on land near Šabac. A total of 5,606 photovoltaic panels with a capacity of 580 Wp each were installed, producing clean and renewable energy for the local community. The plant is connected to the grid through a transformer station TS 20/0.8 kV with a capacity of 2×1600 kVA.

Solar panels at Solar Power Plant Tabanović built by Elektrovat

In addition to the solar power plant itself, the project included the construction of a connection point facility (OMP), laying of 20 kV cable lines with a total length of 1,977 meters, and the installation of a medium-voltage switchgear using SF6 technology.

Key Features

  • Panel Capacity: 3.25 MWp (5,606 photovoltaic modules).

  • Inverter Power: 2.88 MW (9 inverters SG350HX).

  • Transformer Station (TS 20/0.8 kV): Capacity of 2×1600 kVA.

  • Medium-Voltage Switchgear (20 kV): Prefabricated, using SF6 technology, with a capacity of 24 kV, 630 A, 16 kA/1s.

  • Cable Distribution: 20 kV underground and overhead cables with a total length of 1,977 meters.

  • Control System: Advanced remote monitoring and control system with SCADA support, including communication with inverters via Modbus and Sunspec protocols, as well as support for IEC 61850 and 60870-5-101/104 protocols for integration with supervisory systems. The controller enables energy production forecasting based on weather forecasts and provides secure remote access via Telegram and OpenVPN.

Our Services Included:

  • Preparation of conceptual and execution designs for the solar power plant, transformer station, and medium-voltage switchgear.

  • Dimensioning of electrical installations, including cable distribution, grounding, and lightning protection.

  • Design and installation of medium-voltage switchgear (IM + IM + TM + IMM + DM1-A) with SF6 circuit breakers.

  • Design of surge protection and fire protection systems to ensure plant reliability.

  • Calculation and selection of poles, foundations, and capacity of medium-voltage switchgear.

  • Implementation of remote monitoring and radio communication systems with the dispatch center.

 

The photovoltaic power plant “Tabanović” is a significant step toward a sustainable future, making a notable contribution to reducing CO₂ emissions and increasing the production of green energy in Serbia. High-quality construction, advanced technical solutions, and reliable medium-voltage switchgear ensure long-term and stable operation of the plant.