Project Description
Small hydropower plant Komalj
General contractor: Elektrovat LTD, Belgrade
Investor: Zlatiborske Elektrane LTD, Čačak
During the implementation of the project, the following was done at the hydropower plant:
Designing Preliminary design, project detail design, designs necessary for a construction permit, for the purposes of obtaining the necessary permits.
Construction of machine hall and pipelines;
Design, delivery, installation and commissioning of SCADA systems and control systems;
Delivery, installation, connection and commissioning of energy cabinets;
Delivery, installation, connection and commissioning of control cabinets;
Delivery, installation, connection, and commissioning of the generator (generator 1: 360kVA, generator 2: 280kVA);
Delivery and installation of cable routes;
Delivery, installation and connection of cables;
Delivery, installation and commissioning of panel shutters;
Delivery, installation and commissioning of 35kV power cable;
Construction of a hydropower tunnel in the length of 90 m;
Manufacture of supply GRP and SPIRO pipeline, in the length of 2000 m;
Construction of access roads from SHPP Beli Kamen to SHPP Komalj;
QUALITY GUARANTEE
High quality and business level of our company have been awarded an official acknowledgment via receiving certification for establishing Quality Management System (QMS) ISO 9001:2015, Environmental Protection Control System ISO 14001:2015, Occupational Health and Safety Management System OHSAS ISO 45001:2018 and Certificate of which we are particularly proud of – Energy Management System ISO 50001:2018 and Information Security Management Certificate ISO/ IEC 27001:2014
HOW CAN WE HELP?
Do you need assistance with some project of yours, or you simply want to explore your options… don’t hesitate!