During the implementation of the project, the following was done at the hydropower plant:

  • Designing Preliminary design, project detail design, designs necessary for a construction permit, for the purposes of obtaining the necessary permits.

  • Construction of machine hall and pipelines;

  • Design, delivery, installation and commissioning of SCADA systems and control systems;

  • Delivery, installation, connection and commissioning of energy cabinets;

  • Delivery, installation, connection and commissioning of control cabinets;

  • Delivery, installation, connection, and commissioning of the generator (generator 1: 360kVA, generator 2: 280kVA);

  • Delivery and installation of cable routes;

  • Delivery, installation and connection of cables;

  • Delivery, installation and commissioning of panel shutters;

  • Delivery, installation and commissioning of 35kV power cable;

  • Construction of a hydropower tunnel in the length of 90 m;

  • Manufacture of supply GRP and SPIRO pipeline, in the length of 2000 m;

  • Construction of access roads from SHPP Beli Kamen to SHPP Komalj;

For privacy reasons YouTube needs your permission to be loaded. For more details, please see our Privacy Policy.
For privacy reasons YouTube needs your permission to be loaded. For more details, please see our Privacy Policy.

HOW CAN WE HELP ?

Do you need assistance with some project of yours, or you simply want to explore your options… don’t hesitate!

WORKING HOURS

8:00am – 4:00pm

WORKING HOURS

8:00am – 4:00pm