Small hydroelectric power plant Beli kamen

General contractor: Elektrovat LTD, Belgrade

Investor: Zlatibor Power Plants

During the implementation of the small hydroelectric power plant, the following was done:

  • Construction of access roads;

  • Construction of a hydraulic tunnel, 450 m long;

  • Production of pipelines 2700 m in length, water intake, sedimentation tanks;

  • Construction of machine hall, and installation of complete electrical installations;

  • Delivery and installation: MV switchgear 35kV, water turbine (1150kW + 470kW) and generator (1500kVA + 700kVA);

  • Delivery of cable  and installation of cable routes;

  • Connection of power cable in Substation Zlatibor 3, 35 / 10kV;

  • Excavation of the trench and laying of the connecting cable, total length 11700 m;

For privacy reasons YouTube needs your permission to be loaded. For more details, please see our Privacy Policy.
I Accept

For privacy reasons YouTube needs your permission to be loaded. For more details, please see our Privacy Policy.
I Accept

QUALITY GUARANTEE

The high quality and business level of our company has received the official confirmation through the acquisition of certificates for the established Quality Management System (QMS) ISO 9001:2015, Environmental Management System ISO 14001:2015, Occupational Health and Safety Management System ISO 45001:2018, Energy Management System EN ISO 50001:2018, and Information Security Management System ISO/IEC 27001:2014.

HOW CAN WE HELP?

Do you need assistance with some project of yours, or you simply want to explore your options… don’t hesitate!

WORKING HOURS

8:00am – 4:00pm

WORKING HOURS

8:00am – 4:00pm