Project Description

Small hydroelectric power plant Beli kamen

General contractor: Elektrovat LTD, Belgrade

Investor: Zlatibor Power Plants

During the implementation of the small hydroelectric power plant, the following was done:

  • Construction of access roads;

  • Construction of a hydraulic tunnel, 450 m long;

  • Production of pipelines 2700 m in length, water intake, sedimentation tanks;

  • Construction of machine hall, and installation of complete electrical installations;

  • Delivery and installation: MV switchgear 35kV, water turbine (1150kW + 470kW) and generator (1500kVA + 700kVA);

  • Delivery of cable  and installation of cable routes;

  • Connection of power cable in Substation Zlatibor 3, 35 / 10kV;

  • Excavation of the trench and laying of the connecting cable, total length 11700 m;

For privacy reasons YouTube needs your permission to be loaded. For more details, please see our Privacy Policy.
I Accept

For privacy reasons YouTube needs your permission to be loaded. For more details, please see our Privacy Policy.
I Accept

QUALITY GUARANTEE

High quality and business level of our company have been awarded an official acknowledgment via receiving certification for establishing Quality Management System (QMS) ISO 9001:2015, Environmental Protection Control System ISO 14001:2015, Occupational Health and Safety Management System OHSAS ISO 45001:2018 and Certificate of which we are particularly proud of – Energy Management System ISO 50001:2018 and Information Security Management Certificate ISO/ IEC 27001:2014

HOW CAN WE HELP?

Do you need assistance with some project of yours, or you simply want to explore your options… don’t hesitate!

Thank you for your message. It has been sent.
There was an error trying to send your message. Please try again later.

OFFICE LINE

MAIL

WORKING HOURS

8:00am – 4:00pm

OFFICE LINE

MAIL

WORKING HOURS

8:00am – 4:00pm