Small hydroelectric power plant Beli kamen

General contractor: Elektrovat LTD, Belgrade

Investor: Zlatibor Power Plants

During the implementation of the small hydroelectric power plant, the following was done:

  • Construction of access roads;

  • Construction of a hydraulic tunnel, 450 m long;

  • Production of pipelines 2700 m in length, water intake, sedimentation tanks;

  • Construction of machine hall, and installation of complete electrical installations;

  • Delivery and installation: MV switchgear 35kV, water turbine (1150kW + 470kW) and generator (1500kVA + 700kVA);

  • Delivery of cable  and installation of cable routes;

  • Connection of power cable in Substation Zlatibor 3, 35 / 10kV;

  • Excavation of the trench and laying of the connecting cable, total length 11700 m;

For privacy reasons YouTube needs your permission to be loaded. For more details, please see our Privacy Policy.

For privacy reasons YouTube needs your permission to be loaded. For more details, please see our Privacy Policy.

HOW CAN WE HELP ?

Do you need assistance with some project of yours, or you simply want to explore your options… don’t hesitate!

WORKING HOURS

8:00am – 4:00pm

WORKING HOURS

8:00am – 4:00pm