Reconstruction and Modernization of Medium Voltage Switchgear for Tigar Tyres facility in Pirot

We are excited to highlight our involvement in the comprehensive reconstruction and modernization of the Medium Voltage (MV) switchgear projects at Tigar Tyres in Pirot. Partnering with Tigar Tyres, we are dedicated to delivering top-notch electrical solutions tailored to enhance operational efficiency and reliability.

We are excited to highlight our involvement in the comprehensive reconstruction and modernization project of the Medium Voltage (MV) switchgear at Tigar Tyres in Pirot. Partnering with Tigar Tyres, we are dedicated to delivering top-notch electrical solutions tailored to enhance operational efficiency and reliability.

Elevate your electrical infrastructure with Elektrovat’s expertise in reconstruction and modernization of Medium Voltage Switchgear

Project Overview:

  • Reconstruction of MV Switchgear (6kV):

    • Delivery, installation, and seamless integration of MV switchgear to ensure smooth operations.
    • Workshop production and installation of a robust transformer station (6/0.4kV, 1600kVA) for optimal power distribution.
    • Assembly of cabinet for reactive power compensation (1200kVAr) to improve power factor and efficiency.
    • Execution of MV and LV cable connections to ensure a reliable power supply network.
  • Reconstruction of LV Switchgears at TS Tigar 2:

    • Workshop production, delivery, and installation of LV switchgears type Prisma SFP (2000A, 2 units) to meet the facility’s power distribution requirements.
    • Delivery and installation of prefabricated busbar trunking systems (Canalis 2000A, 4 sets) for efficient power distribution.
  • Execution of Transformer Station Installations:

    • Implementation of transformer station installations MBTS 10/0.72kV, 2000kVA (1000+1000)kVA, including the execution of MV and LV cable lines to ensure reliable power distribution.
    • Reconstruction of automatic control systems for improved operational control of rubber double roller No.1.
    • Execution of transformer station installations (TS 6) to meet specific power requirements (1x1250kVA).
    • Delivery and installation of MV switchgear type SM6 and cable line to ensure a reliable power supply network.
    • Implementation of transformer station installations MBTS 10/0.4kV (1x2000kVA) to enhance power distribution capabilities.

QUALITY GUARANTEE

High quality and business level of our company have been awarded an official acknowledgment via receiving certification for establishing Quality Management System (QMS) ISO 9001:2015, Environmental Protection Control System ISO 14001:2015, Occupational Health and Safety Management System OHSAS ISO 45001:2018 and Certificate of which we are particularly proud of – Energy Management System ISO 50001:2018 and Information Security Management Certificate ISO/ IEC 27001:2014