Photovoltaic Power Plant Ribnica 1 in Kraljevo
In collaboration with S.O.K. DOO Kraljevo, Elektrovat has successfully carried out the construction of the Ribnica 1 photovoltaic power plant in Kraljevo.
The Ribnica 1 photovoltaic power plant represents a significant step toward enhancing energy efficiency and sustainable development in the Kraljevo region. As a part of the broader initiative to build three solar power plants in the Ribnica area, Elektrovat has played a key role in realizing this ambitious project. The chosen location for the Ribnica 1 power plant is situated outside the urban development area, on parcels with favorable land characteristics that allow for optimal solar energy utilization. Our firm was responsible for executing all engineering tasks, including planning, design, and construction of the facilities to achieve a total capacity of 563 kW.
Our commitment to quality and innovation is reflected in every aspect of this project, from optimizing the space for the solar power plant to implementing the latest technologies in photovoltaic systems. Through this project, we not only contribute to local energy independence but also lay the groundwork for future renewable energy projects in Serbia.
In the course of the Ribnica 1 photovoltaic power plant project, our firm successfully completed a series of key activities that enabled the completion and commissioning of this significant energy facility. Below is an overview of the work we carried out during the project:
QUALITY GUARANTEE
The high quality and business level of our company has received the official confirmation through the acquisition of certificates for the established Quality Management System (QMS) ISO 9001:2015, Environmental Management System ISO 14001:2015, Occupational Health and Safety Management System ISO 45001:2018, Energy Management System EN ISO 50001:2018, and Information Security Management System ISO/IEC 27001:2014.