Discover how Elektrovat and Hiperion Sol d.o.o. contributed to the renewable energy landscape with the successful implementation of the Photovoltaic Power Plant Margisol in Ćuprija. From connecting to the distribution power system to expanding SCADA systems, this project exemplifies innovation in sustainable energy solutions.

Presenting an overview of completed tasks:

  • Connecting the photovoltaic power plant to the distribution power system:

    • Installation of equipment in transformer station TS 35/10kV Ćuprija 4.
    • Equipment installation in the 35kV cell and 35kV cable line installation.
  • Expansion of the SCADA system and configuration of the existing remote station.

  • Execution of transformer station installations:

    • TS 35/0,8kV, 2x2000kVA.
  • Parameterization of microprocessor protection units in medium voltage switchgear 35kV.

  • Testing and commissioning of the substation.