Photovoltaic power plant on the roof of the business and production facility of the company Stetex doo, in Arilje
The family company Stetex d.o.o was founded in 1992. with its headquarters in Arilje at the address Stevana Čolovića bb. the main activity of the company is the production and sale of furniture.
The Elektrovat team has completed the first out of a total of two phases related to the construction of photovoltaic panels and a power plant for Stetex.
Energy is delivered to the distribution network through the existing infrastructure, in accordance with:
“Decree on criteria, conditions and manner of calculation of receivables and liabilities between the buyer-producer and supplier” (“Official Gazette of Republic of Serbia” No. 83/2021).
The photovoltaic power plant was built on the southwest (azimuth 63.1 °) side of the old production facility, with a slope of 12 °.
According to the project, a two phase photovoltaic power plant build was planned: