Medium voltage Cable Installation and TS-FAM3 Construction for Valvoline in Kruševac
Elektrovat has successfully completed the installation of 10 kV supply cables (380 m in length) and the full construction of the new TS-FAM3 (1×630 kVA) substation at their Valvoline site in Kruševac, for ELLIS ENTERPRISES EAST. The project includes HDD drilling, standard cable trench excavation, and the installation of Schneider Electric equipment (Trihal 1×630 kVA, RM6, Prisma).
Detailed Project Description
By executing this project, Elektrovat demonstrated its capability to provide high-quality services in medium voltage cable installation, substation construction, and the implementation of top-grade certified equipment, enhancing the energy infrastructure and safety at the Valvoline facility in Kruševac.