Elektrovat at Strabag – Brose Factory, Pančevo

At the Brose Factory in Pančevo, Elektrovat collaborated with Strabag d.o.o. Belgrade to execute a comprehensive electrical installation project including substation electrical installation services.

The scope of work included:

  • Installation of a prefabricated busbar trunking system encompassing various amperages: 2500A, 2000A, 1600A, 800A, 630A, spanning a total of 23 lines and 3319m.

  • Workshop production and installation of LV distribution cabinets.

  • Execution of electrical installations at the substation TS 4x2500kVA 10/0.4kV.

  • Installation of a 20kV switchgear, utilizing ABB's UniSec 24 type.

  • Deployment of transformers rated at 2500kVA.

  • Prefabricated installation of a 4000A busbar trunking system (4 sets).

  • Workshop production and installation of type-tested LV switchyards rated at 4000A, type Pro E power (4 units).

  • Deployment of 4 energy reactive compensation cabinets.

This project underscores Elektrovat's commitment to delivering high-quality electrical solutions tailored to the needs of industrial clients.

QUALITY GUARANTEE

The high quality and business level of our company has received the official confirmation through the acquisition of certificates for the established Quality Management System (QMS) ISO 9001:2015, Environmental Management System ISO 14001:2015, Occupational Health and Safety Management System ISO 45001:2018, Energy Management System EN ISO 50001:2018, and Information Security Management System ISO/IEC 27001:2014.

HOW CAN WE HELP?

Do you need assistance with some project of yours, or you simply want to explore your options… don’t hesitate!

WORKING HOURS

8:00am – 4:00pm

WORKING HOURS

8:00am – 4:00pm