Construction of TS 35/10kV Substation for Henkel Srbija d.o.o. – Kruševac

We are proud to present our project – the reconnection of the internal 10kV cable network and the new TS 35/10kV substation at the Henkel factory in Kruševac. This project contributes to the improvement of electrical installations and ensures a stable power supply for production processes.

Elektrovat, Construction of TS 35/10kV Substation for Henkel Srbija d.o.o. - Kruševac

Project Highlights:

  • Construction of TS 35/10kV substation

  • Equipment supply and installation:

    • SM6 35kV and SM6 10kV switchgear (Schneider Electric).
    • Workshop manufacturing and installation of distribution panels for internal consumption (AC and DC) – 5 units.
    • Distribution panel for the substation computer.
  • Automation and control:

    • Development of SCADA application
    • PLC controller programming
    • HMI panel application development
  • Substation commissioning

  • Technical Equipment and Infrastructure:

    • 2 transformers (8MVA)
    • Full automation system
    • Modern monitoring and control systems

We thank Henkel Srbija d.o.o. for their trust, and our expertise in electrical engineering ensured the safe and efficient commissioning of the substation. This project is a key step in maintaining a stable energy supply for Henkel’s Kruševac factory.