Elektrovat took part in the construction and designing of Wastewater treatment plant (WWTP) in Tivat – Kotor, Montenegro.

Elektrovat prepared the project documentation, delivered and installed the equipment and put the plant into operation.

In cooperation with the main contractor WTE Wassertechnik GmbH, Elektrovat performed the designing and implementation of the following items at the Tivat – Kotor Wastewater Treatment Plant:

  • Construction of MBTS 10 / 0.4kV 2x1000kVA substation.
  • Production, delivery, and installation of four EMP distribution plants and PLC cabinets.
  • Delivery and installation of two diesel generators, installation of instrumentation, installation of an electric motor drive.
  • Development of the application software for PLC controllers, development of SCADA application software.
  • Putting the system into automatic operation mode.